The Fletcher Creek Greenway is a Tennessee Department of Transportation (TDOT) grant project being constructed with 80% federal funds and 20% local match. 

Phase 1 is 9/10-mile in length and was completed and officially opened April 21, 2017. A small parking lot is located on the corner of Santa Valley and Highway 64 and the paved pathway connects to Yale Road at Brother Boulevard. 

Phase 2 was completed in late-February 2021 and was dedicated with a ribbon cutting on March 24, 2021. There is a small parking lot accessible from Brother Boulevard and it is adjacent to the trailhead. Phase 2 connects to Madison Arthur Byrd Park at Summerdale Drive.

Phase 3 should begin construction in late summer to early fall of 2025 and Phase 4 is currently in the design phase with construction planned for late-2026 to early-2027.

Updated 7-1-2025